FOLLOW THE SITE AS IT DEVELOPS...

Photos taken on 21st March of the caravan plots being surfaced

30/03/2012

Click on the image to enlarge

Childrens play area nearing completion 21st March

30/03/2012

Click on the image to enlarge

Main reception and wash rooms 25th March

30/03/2012

Click on the image to enlarge

Final layer of Tarmac being put down 27th March.....on the road to completion!

30/03/2012

Click on the image to enlarge

Tiling in the toilet block, the new transformer for the electricity being installed and progress on the outside of the buildings.

16/01/2012

Click on the image to enlarge

Showing the main entrance being opened out and surfaced after the diversion of the main water pipe that passed in the way across this area.

16/01/2012

Click on the image to enlarge

These show the under floor heating in the reception going in, the progress with the roofing etc and a service point under construction.

25/11/2011

Click on the image to enlarge

More images from the 25th November as below.

25/11/2011

Click on the image to enlarge

The roadside hedge being removed to form the new entrance. Approximately 200 meters of hedge has had to be removed to create the new entrance and visibility splay. A new fence and hedge will be planted as soon as possible. Note the ecologist looking for any creatures that may be still in the hedge before the digger arrives!

26/10/2011

Click on the image to enlarge

Pictures taken on 12th October showing the crushing of the old site roads and buildings for re-use on site and progress with the cladding of the toilet block and also pitch construction.

19/10/2011

Click on the image to enlarge

Taken on 19th October showing progress with the cladding of the toilet block, the start of construction of the machinery shed and brick work of the reception block. The Cladding will now be over clad with timber to make it look like an old barn.

19/10/2011

Click on the image to enlarge

These photographs were all taken on the 28th and show the main approach road being surfaced. The roof of the toilet block being clad and the floor prepared and also the remains of the 3 army mess buildings now that they have been demolished after the rehomeing of the Bats.

28/09/2011

Click on the image to enlarge

Images continued from the development above.

28/09/2011

Click on the image to enlarge

These were all taken on 19.9.2011 and show the approach road kerbing and leveling taking place and the general works on the rest of the site moving forward.

19/09/2011

Click on the image to enlarge

These were also all taken on 19.9.2011 and show the approach road kerbing and leveling taking place and the general works on the rest of the site moving forward.

19/09/2011

Click on the image to enlarge

Taken on 9.9.11 showing the entrance road under construction and the completed steelwork for the toilet and reception block

11/09/2011

Click on the image to enlarge

These pictures show the new reception and toilet block steel work being erected on 6.9.2011.

06/09/2011

Click on the image to enlarge

Here is the site on the 24th August. The base tarmac is going down on the site roads and the construction of the drainage system is underway.

24/08/2011

Click on the image to enlarge

These images are from the 18th August.

The site roads are being dug and stoned up and the reception and toilet block footings are being concreted.

17/08/2011

Click on the image to enlarge

This was the site at the end of July. The initial earthmoving underway for the new access road and site roads.

28/07/2011

Click on the image to enlarge